PRODUCTION SYSTEMS : PLANNING; ANALYSIS AND CONTROL
Sábháilte in:
Príomhchruthaitheoir: | |
---|---|
Formáid: | LEABHAR |
Foilsithe / Cruthaithe: |
NEW YORK
JOHN WILEY AND SONS
1987
|
Eagrán: | 4TH |
Ábhair: | |
Clibeanna: |
Cuir clib leis
Níl clibeanna ann, Bí ar an gcéad duine le clib a chur leis an taifead seo!
|
MARC
LEADER | 00000nam a2200000Ia 4500 | ||
---|---|---|---|
100 | |a RIGGS JAMES L | ||
250 | |a 4TH | ||
020 | |||
650 | |||
942 | |c BK | ||
245 | |a PRODUCTION SYSTEMS : PLANNING; ANALYSIS AND CONTROL | ||
260 | |c 1987 |b JOHN WILEY AND SONS |a NEW YORK | ||
082 | |a 658.5 | ||
300 | |a XXI,745 | ||
999 | |c 277488 |d 277488 | ||
952 | |0 0 |1 0 |4 0 |7 0 |a 00004532 |b 00004532 |d 1998-02-13 |l 0 |o 658.5 |p 017735 |r 2017-09-07 00:00:00 |v 283.65 |w 2017-09-07 |y BK | ||
952 | |0 0 |1 0 |4 0 |7 0 |a 00004532 |b 00004532 |d 1998-02-13 |l 0 |o 658.5 |p 017736 |r 2017-09-07 00:00:00 |v 95.00 |w 2017-09-07 |y BK |