Cycle Time Reduction in Manufacturing Sector Using Six Sigma Methodologies
Saved in:
Main Author: | |
---|---|
Format: | Thesis Book |
Published: |
Mumbai
|
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
MARC
LEADER | 00000nam a2200000Ia 4500 | ||
---|---|---|---|
100 | |a Dasake Aarti,Nanarkar Swapnil | ||
502 | |d 2013 | ||
518 | |a 2013-08-09 | ||
502 | |c School of science NMIMS | ||
942 | |c R | ||
245 | |a Cycle Time Reduction in Manufacturing Sector Using Six Sigma Methodologies | ||
260 | |a Mumbai | ||
999 | |c 334762 |d 334762 | ||
952 | |0 0 |1 0 |4 0 |7 0 |9 399347 |a 00004535 |b 00004535 |d 2018-04-09 |l 0 |p SOSR20 |r 2018-04-09 |w 2018-04-09 |y R |