Cycle Time Reduction in Manufacturing Sector Using Six Sigma Methodologies

Saved in:
Bibliographic Details
Main Author: Dasake Aarti,Nanarkar Swapnil
Format: Thesis Book
Published: Mumbai
Tags: Add Tag
No Tags, Be the first to tag this record!

MARC

LEADER 00000nam a2200000Ia 4500
100 |a Dasake Aarti,Nanarkar Swapnil 
502 |d 2013 
518 |a 2013-08-09 
502 |c School of science NMIMS 
942 |c R 
245 |a Cycle Time Reduction in Manufacturing Sector Using Six Sigma Methodologies  
260 |a Mumbai  
999 |c 334762  |d 334762 
952 |0 0  |1 0  |4 0  |7 0  |9 399347  |a 00004535  |b 00004535  |d 2018-04-09  |l 0  |p SOSR20   |r 2018-04-09  |w 2018-04-09  |y R